webpass logo
San Francisco Oakland San Diego Miami
Emeryville Berkeley
Miami Beach Hollywood Fort Lauderdale
Call 415.233.4100 Metro Link Point-to-point Ethernet
  • How long does it take to install a Metro Link circuit?
  • Webpass installs all Metro Link circuits within 30 days of receiving the ROE and signed work order.

  • Can I move one end of a Metro Link circuit to my new location?
  • Yes. If your business is moving, Webpass will move the Metro Link to a new location at no cost.

  • Can I reconfigure an existing Metro Link into a Mesh?
  • Yes. Webpass can reconfigure an existing Metro Link between two locations into a Mesh connecting three locations. Installation fees apply for the third location.